Area |
Guerneville |
Topic |
WQ: Estuary 1998 Hydrolab Temp, Salinity and DO Station #3 Sept-Nov |
|
Caption: An automated Hydrolab data probe was placed near the mouth of Willow Creek from September 22 to November 10, 1998 and temperature, salinity and dissolved oxygen measurements are shown above. MSC (1999) noted that: "There was a diel DO sag in the creek of 2-3 ppm. Lowest DO values often coincided with draining after breaching events: minima were 2.5 and 2.2 ppm following the third and fourth breaching events (breached at 7.8 and 6.5 feet, respectively). The overall lowest DO recorded was 1.5 ppm at 0800 hr on 29 October, just after the brief bar-open period following the breaching of 27 October (breached at 7.4 ft)." Breaching events in this period were September 20, October 12 and November 4. See the Picture tab for monitoring locations. Click on InfoLinks for more information.
|
|
|
To learn more about this topic click
Info Links .
To view additional information (data source, aquisition date etc.) about this page, click
Metadata .
To view the table with the chart's data, click
Chart Table web page.
To download the table with the chart's data, click
wq_sond_3_2_1998_sept_nov.dbf (size 16,858 bytes) .
To view the table with the chart's source data, click
Source Table web page. To download the table with the chart's source data, click
wq_sond_3_2_1998_sept_nov.dbf (size 16,858 bytes)