Area Scott River
Topic Tour: Restoration Faye Lane (Bank Stabilization/Riparian)
 

faye2.jpg 108K  Click on image to enlarge (108K).

Faye Lane bridge over Scott River looking upstream prior to flood during summer 1996. The area upstream was the site of an extensive bank stabilization and riparian restoration project accomplished by the Scott CRMP. Photo provided by the Siskiyou Resource Conservation District.


faye7.jpg 150K  Click on image to enlarge (150K).

Faye Lane bank protection project under construction in late summer 1996. This is the site of the only significant bank failure during high water on January 1, 1997 (see Picture#1 next Topic). Photo provided by a Siskiyou Resource Conservation District.


faye3.jpg 146K  Click on image to enlarge (146K).

Faye Lane bank stabilization project just below French Creek looking downstream. Rock deflectors protect the bank while creating pools and cover for fish. Fine sediment also collects behind the rock structures. Photo provided by the Siskiyou RCD.


black5.jpg 136K  Click on image to enlarge (136K).

Riparian planting technique at Faye Lane using a backhoe to excavate a hole or trench where willow and cottonwood cuttings or starts are buried. This technique has very high survival and the roots of the trees greatly enhance bank stability. Photo provided by the Siskiyou RCD.


faye5.jpg 113K  Click on image to enlarge (113K).

Rock deflectors at the upper portion of the Faye Lane project during high water in early December 1996 looking upstream. This flow is near bank full and the project survived intact. Photo provided by the Siskiyou RCD.


faye1.jpg 85K  Click on image to enlarge (85K).

High water from December 31, 1996 looking upstream at the Faye Lane Bridge in the Scott Valley. A large cottonwood tree washed away at this site but some elements of bank stabilization project remained intact (see the next Tour for after January 1997 Flood). Photo provided by a Siskiyou Resource Conservation District.


black6.jpg 166K  Click on image to enlarge (166K).

This photo shows excavation of a willow planting and shows root development after only two to three months using the deep planting technique. Photo provided by the Siskiyou RCD.


faye8.jpg 120K  Click on image to enlarge (120K).

Fish screen housing under construction at the Faye Lane restoration site. Photo courtesy of the Siskiyou RCD.