KRIS Navarro : Chart Table Page
Area | Mainstem |
Topic | Sediment: Road Treatment Prescriptions in Mill Creek 1998-99 |
Caption: The Chart Table sed_roads_mill_mcrcdpwa_98_99_prescrip.db shows recommended treatments for roads in the Mill Creek Watershed that were inventoried during road surveys in 1998 and 1999. Data were provided by the Mendocino County Resource Conservation District and Pacific Watershed Associates (1998 and 2002). See Info Links for more information.
50 rows of a possible 192 have been displayed.
Treatment_Type | Phase1 | Phase2 |
---|---|---|
Rock road surface | 414 | 27 |
Install rolling dips | 357 | 79 |
Install ditch relief CMP | 110 | - |
Outslope road & fill ditch | 103 | - |
Cross-road drains | - | 85 |
Excavate doil | 45 | 30 |
Critical dip | 38 | 4 |
Replace CMP | 32 | 8 |
Remove berm | 26 | - |
Wet crossing | 13 | 7 |
Install CMP | 17 | 2 |
Down spouts | 13 | 1 |
No treatment recommended | 7 | 4 |
Outslope road & retain ditch | 10 | - |
Clean CMP | 8 | - |
Install flared inlet | 8 | - |
Inslope road | 7 | - |
Armor fill face | 3 | 2 |
Clean ditch | 5 | - |
Install trash rack | 3 | - |
Remove ditch | 2 | - |
Install bridge | 1 | - |
Clean culvert | - | 1 |
In stream armour | - | 1 |
Clean/cut ditch | - | 1 |
Other | 1 | - |