Area |
Mainstem Trinity |
Topic |
Flow: Inflow vs. Trinity 1965 |
|
Caption: Once Trinity Dam was built the flow below the dam in the Trinity River did not necessarily reflect inflow into the reservoir above the dam. The 1965 water year included the 1964 flood, which was captured by the newly raised dams and no flow peak is noticeable below Lewiston. Data provided by the U.S. Bureau of Reclamation and U.S. Geologic Survey.
|
|
|
To learn more about this topic click
Info Links .
To view additional information (data source, aquisition date etc.) about this page, click
Metadata .
To view the table with the chart's data, click
Chart Table web page.
To download the table with the chart's data, click
mtlewcfs_updated2000.dbf (size 419,476 bytes) .